The Finish, 9/02-10/02
this page is not quite done with yet as there are a few more pictures of the interior, plus all the exterior shots left to upload.
Finally. the light at the end of the tunnel.  Its been a long journey and a hard road, but as you can see from these photos, it was worth the effort.
This first section of photos are of the renovated kitchen and dining room areas.  We turned what used to be the garage into additional living space, added a washer/dryer room. bathroom with a shower, and a new dining area.
This next section of pictures are from the original bathroom.  We resurfaced the bathtub, replaced the plumbing and fixtures on the tub and the sink, replaced the toilet, and replaced the old mirror cabinet with a new one.
This section of photos shows the work done on the three bedrooms of the house, the hall way, the finished installation of the attic doorway and the air intake unit for the central ac/heat we put in, and the resurfacing of the hardwood floors.
These are shots of the outside of the house. We had to repaint the whole house, repair the shed and front walk, plus we paved the driveway.